Friday, 7 August 2020

4th axis - finally completed

Finally all assembled and all machine screws fitted. No cockups or fettling required.

36mm through bore:


Fixing slots spaced to suit the table of The Shiz


Chuck at top front of box, to minimise intrusion into the machine space




4th axis - done.

TFFT. Now I guess I'll have to mount it on the machine and try it out.

No comments:

Post a Comment

Getting an ESP32-S3-Mini to talk to an HX711 load cell amplifier and the Bojke laser distance sensor

It's all very well using that large DIN Rail-mounted ESP32-S3-POE-ETH-8DI-8DO to talk to the laser sensor and load cell but it feels a b...