Friday, 11 January 2019

X and Y axes up and running!

Now that the servos are wired up and running, time for a tidy up:


Everything is assembled and wired up on the X and Y axes.


Meanwhile, The Shiz sits quietly, watching proceedings....


Just to prove it's actually running:


There. Next, limit switches and then the Z axis!

No comments:

Post a Comment

Metal bashing - hacking the Bridgeport about for plasma cutting

The electronics is sorted for the time being, as it appears I have got the pilot arc thing covered. Now, time to do some mechanical work, st...