Friday, 7 August 2020

4th axis - finally completed

Finally all assembled and all machine screws fitted. No cockups or fettling required.

36mm through bore:


Fixing slots spaced to suit the table of The Shiz


Chuck at top front of box, to minimise intrusion into the machine space




4th axis - done.

TFFT. Now I guess I'll have to mount it on the machine and try it out.

No comments:

Post a Comment

Setting up to test the rewired CNC Bantam and Probe Basic Lathe

Now that I've developed a ballscrew attachment for the JD TB3 tube bender, I need to prepare to get the new compts machined. This requir...