Saturday, 10 March 2018

Cabinet fettling.

Need to make holes for all the cable entries, switch / display / air inlet etc. Not the most enjoyable part, as it's a steel box. The big holes will be challenging....

These are the holes required:

Top:

  • VFD conduit
  • Mains inlet
  • Probe connection
  • 4th axis connection
  • PC / Ethernet connections
Bottom:

  • X, Y & Z axis motors
  • X & Y limit switches
  • Coolant and lube pump

No comments:

Post a Comment

Cooker hood and clock face

More domestic chores, Fatty? Yes, The Stupid Fat Bloke has been busy again. The extractor hood above the cooker hob has been dodgy ever sinc...