Cabinet fettling.

Need to make holes for all the cable entries, switch / display / air inlet etc. Not the most enjoyable part, as it's a steel box. The big holes will be challenging....

These are the holes required:

Top:

  • VFD conduit
  • Mains inlet
  • Probe connection
  • 4th axis connection
  • PC / Ethernet connections
Bottom:

  • X, Y & Z axis motors
  • X & Y limit switches
  • Coolant and lube pump