Saturday, 10 March 2018

Cabinet fettling.

Need to make holes for all the cable entries, switch / display / air inlet etc. Not the most enjoyable part, as it's a steel box. The big holes will be challenging....

These are the holes required:

Top:

  • VFD conduit
  • Mains inlet
  • Probe connection
  • 4th axis connection
  • PC / Ethernet connections
Bottom:

  • X, Y & Z axis motors
  • X & Y limit switches
  • Coolant and lube pump

No comments:

Post a Comment

Get those tube bender brackets finished!

Last time, I'd drilled and bored out the brackets for the bearing and ballnut. To complete these parts and approach the point of assembl...