Saturday, 10 March 2018

Cabinet fettling.

Need to make holes for all the cable entries, switch / display / air inlet etc. Not the most enjoyable part, as it's a steel box. The big holes will be challenging....

These are the holes required:

Top:

  • VFD conduit
  • Mains inlet
  • Probe connection
  • 4th axis connection
  • PC / Ethernet connections
Bottom:

  • X, Y & Z axis motors
  • X & Y limit switches
  • Coolant and lube pump

No comments:

Post a Comment

TIG welder up and running - after some fault diagnostics and repair

Finally got some time to connect up the flow meter and argon hose. Plugged in the torch and ground cables and the torch hose etc. Powered it...